Project works may include but are not limited to the following: The Work, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract (the "Project"). In brief summary, the Work is comprised of but not limited to; 1. The scope of this RFT includes the supply, delivery, setup, and installation of new overhead steel roll-up doors, high-speed rubber doors, and related components (e.g., operators, safety edges, photoeyes, springs, chains, and cables) to ensure proper operation, when required at Solid Waste Management Services sites. Most overhead doors use electric powered motors; some operate using a pneumatic system. 2. The scope also includes the supply, delivery, and installation of new overhead door disconnect switches along with the proper electrical wiring setup to the overhead door. 3. Removal and disposal of the existing overhead door and disconnect switches must be completed by the Successful Supplier.